Telephone: +1 713-993-7007
Email: info@hghouston.com
The materials are provided by the The Hendrix Group Inc. on an "as is" basis, and The Hendrix Group Inc. expressly disclaims any and all warranties, express or implied, including without limitation warranties of merchantability and fitness for a particular purpose, with respect to the materials. In no event shall The Hendrix Group Inc. be liable for any direct, indirect, incidental, punitive, or consequential damages of any kind whatsoever with respect to use of the materials.
API 5CT Grade L80 (Type 1) Tubing: Environmental Cracking in Non-sour Service Wells and the Influence of Metallurgy, Well Stimulation and Chemical Treatment
1-Essential Elements of a Piping Reliability Program-Development and Management of Corrosion Systems and Circuits.pdf
2-The elusive goal of Root Cause failure analysis–the importance of persistence as illustrated by O-G production corrosion case histories.pdf
3-Corrosion Control Documents-An Essential Element of a Mechanical Integrity and Risk-based Inspection Program.pdf
4-Corrosion of Copper and Copper Alloys in Potable Water Systems.pdf
5-Corrosion of Metals in Contact with Preservative-Treated Wood-An Update.pdf
6-Benefits and Challenges Associated with CRA Injection Tubing in Corrosive Gas Wells.pdf
7-Brittle Fracture of an Underground Gas Gathering Pipeline at ERW Weld Groove Defects.PDF
8-Aggressive Corrosion of 316SS in an Amine Unit-Causes and Cures.pdf
9-Analysis and Remediation of a CO2 Pipeline Failure.pdf
10-Performance of Cast Tube Alloys in an Ethylene Pyrolysis Test Heater.pdf
11-High Strength Fasteners In Atmospheric Service.pdf
12-Revise Aboveground Storage Tank Inspections.pdf
13-Hydrogen Embrittlement of High‐Strength Fasteners in Atmospheric Service.pdf
14-Hot Corrosion Failure of a 25 MW Land‐Based Gas Turbine in a Marine Environment.pdf
15-Update Aboveground Storage Tank Inspections.pdf
16-Risk Based Inspection-A Qualitative Risk‐Based Methodology for Ranking Fixed Equipment on the Probability of Internal Failure.pdf
17-Hydrogen Attack on Waterwall Tubes in a High-Pressure Boiler.pdf
18-Improve Storage Tank Inspections.pdf
19-Hazardous Chemicals Process Equipment-Assuring Reliability from Design Through Installation.pdf
20-Revising Corporate Standards for Capital Projects-A Case History.pdf
21-Contributing Factors to the Unusual Creep Growth of Furnace Tubing in Ethylene Service.pdf
22-Metallurgical Investigation of a Methanol Furnace Tubing Failure.pdf
If you have questions or need our depth of experience to help with your issues...
Call us: 713-993-7007
Email us: info@hghouston.com
covering updates on corrosion
Testimonials Contact Us
Linkedin